Eliot’s photograph of an overlook above the coast

Approach

Start with the person,
then build the tool.

Four steps shape every project we take on. Here they are, applied to one of them.

The project · Atlas, East Hampton

One project, start to finish.

Atlas began with a pattern at an East Hampton land-use firm: architects new to the town designed first and met the local code later. Below, follow how that pattern became a tool.

Explore Atlas
Atlas interface showing the starting property search
Eliot’s photograph of a rocky coast on a clear day

The approach

From a pattern to a tool.

Step 1 of 4

Who is stuck, and when?

Start with the person. Not the attorneys, who knew the rules. The architect, at the start of design: busy, new to the town, and facing a code, a set of maps, and a permitting process that each take hours to work through. The tool had to fit that moment.

Step 2 of 4

Connect the sources the town already publishes.

Use what already exists. The answers were already public, just scattered: parcel boundaries and tax-map records, the town code, and flood and wetland maps. Atlas uses the parcel as the common thread, so one address brings them together instead of someone searching each source.

Step 3 of 4

Flag what needs a closer look. Don’t rule on it.

Keep judgment with people. A mapped wetland or a preliminary setback calculation is a prompt for review, not a determination. Atlas says so on the page, so the architect knows what to confirm with the town before relying on it.

Step 4 of 4

Give them something to take forward.

Hand it off. The result is a printable property snapshot the architect can bring to design meetings and conversations with the town, with its sources and limits stated.

A forest stream, from Eliot’s photography

Working together

Same steps,
different problems.

The same approach shapes our evidence briefs, reporting tools, and AI workflows. Tell us where things slow down for your team, and bring what you already have.

Discuss a project